What challenges did we face?
The project site is located within a former quarry – now disused and backfilled. This resulted in complex ground preparation prior to construction.
We assisted Hayfield Homes with the detailed remediation and dynamic compaction process, which resulted in NHBC approving an industry standard foundation solution.
What we delivered
The existing pumping station on site needed to be redesigned, which allowed a traditional sheet and frame temporary works system to be installed to depths of over 10m.
Complexities included running sand and a high water table; to overcome this we installed a full well-point dewatering system, which allowed safe access into the pumping station.
What challenges did we face?
This was a challenging first development for Vistry Northern Home Counties in Cranfield, Bedfordshire.
As a solution for reducing both carbon exposure and project costs, we worked with Vistry’s commercial and technical departments to value engineer both subsoil and topsoil disposal quantities.
What we delivered
This value engineering was achieved by our in-house engineering department, who developed a detailed earthworks model, amending site levels to successfully accommodate the site’s total soil quantity.
This was then reviewed and perfected by Vistry’s own engineers and the final strategy resulted in huge value engineered savings for the project.
Having won a competitive tender process, the collaborative approach to cost engineering solutions in a challenging market was refreshing and welcomed.
Mike Darcy
Regional Commercial Director
What challenges did we face?
The site had restricted access with a large off-site haul road – temporary access was successfully installed through third-party land.
On-site water levels were under constant pressure – this was overcome by constructing temporary holding ponds.
The built-up residential area required careful management, with deliveries and plant access carefully planned to reduce the disruption for residents and the local school.
What we delivered
Within 12 months of commencement, 90 new homes were completed, along with the adoptable infrastructures both on and off-site.
Since their introduction to our business, MIDA have grown to become one of our “go to” groundworks contractors.
Antonios Castro
Commercial Director
SERVICES
Landscaping
Why partner with
MIDA Civils?
A well-designed and constructed landscaping package forms a vital part of a development’s first impression.
MIDA strives to impress our clients by providing high-quality work, and this approach applies to all landscaping packages we undertake.
MIDA can offer a full landscaping solution, which includes:
- Paving
- Block paving
- Surfacing works
- Tree and vegetation planting
- Irrigation systems
- Turfing
- Street furniture including signage
- Playgrounds
Explore our
Landscaping projects
100% of our clients have or will
work with us again
Explore our Services
Pre-Construction Services
The successful delivery of any development can start many months before any construction activities begin on site…
Site Clearance & Remediation
MIDA maintains our own fleet of specialist plant and equipment which can mobilise quickly to accommodate our clients’ site requirements…
Earthworks & Enabling Works
Site preparation is essential to enable both temporary and permanent works to be completed safely and efficiently…
Infrastructure & Civil Engineering Works
New roads, drainage, footpaths and utilities: whether they are on or off-site, these works are an essential backbone of all developments…
Groundworks
MIDA can offer our clients a full Groundworks package, ranging from foundation construction through to paving works…
Landscaping
A well designed and constructed landscaping package forms a vital part of a development’s first impression…