Stilton – Bellway

  • Cambridgeshire
  • Residential
  • Bellway Eastern Counties
Project Value
£6m
Homes
90
Adoptable Carriageway
6,000m2
Adoptable Drainage
3000m

What challenges did we face?

This was the first development in decades in the existing village of Stilton. This meant that it was vital the initial phase of construction was sympathetic to the local residents and environment, and ensured compliance with the local authorities construction management plan.

What we delivered

As well as managing the construction project in a way which avoided disrupting local residents, we redesigned service routes to limit and mitigate the level of temporary works required to provide access/egress to the construction site.

This was achieved by careful and considered project planning in partnership with Bellway’s own engineers, and relevant utility providers.

Limiting temporary works and progressing to the permanent works solution reduced potential disruption locally, and saw construction run efficiently.

Infrastructure & Civil Engineering
Groundworks
Infrastructure & Civil Engineering
Groundworks

MIDA provide a fresh approach to working with clients by bringing valuable experience to the table. As well as assisting with the value engineering of a development that works for both contractor and client, they rarely step away from delivering a quality product and service

Dean Takkou​
Construction Director
  • Cambridgeshire
  • Residential
  • Bellway Eastern Counties