Clophill – Hayfield Homes
- Bedfordshire
- Residential
- Hayfield Homes
Project Value
£5.25m
New Homes
50
Deep Pumping Station
8.50m
Offsite Foul Drainage
140m
Remediation & Dynamic Ground Compaction
12 weeks
What challenges did we face?
The project site is located within a former quarry – now disused and backfilled. This resulted in complex ground preparation prior to construction.
We assisted Hayfield Homes with the detailed remediation and dynamic compaction process, which resulted in NHBC approving an industry standard foundation solution.
What we delivered
The existing pumping station on site needed to be redesigned, which allowed a traditional sheet and frame temporary works system to be installed to depths of over 10m.
Complexities included running sand and a high water table; to overcome this we installed a full well-point dewatering system, which allowed safe access into the pumping station.
Pre-Development Assistance
Tree & Vegetation Removal
Infrastructure & Civil Engineering for a Pump Station & s278
Off-site Connections in Hard & Soft Environments
Groundworks
Hard & Soft Landscaping
Pre-Development Assistance
Tree & Vegetation Removal
Infrastructure & Civil Engineering for a Pump Station & s278
Off-site Connections in Hard & Soft Environments
Groundworks
Hard & Soft Landscaping