Quality Alerts

QA1 - Internal Drainage Rockers

QA2 - Service Duct Installation

QA3 - 1st Off Manholes

QA4 - Block Paved Roads

QA5 - Retaining Walls

QA6 - Site Cap Levels

QA7 - Trench Compaction

QA8 - Blocked Drains

QA9 - Threshold Insulation Detail

QA10 - Garden Levels

QA11 - Pre Binder Inspection Form Overview

QA12 - Garden Subsoil Preparation

QA13 - Insulation of Water Services

QA14 - Steel Mesh Recognition

QA15 - Manhole Covers and Ironwork Loadings

QA16 - Wall Tie Spacings

QA17 - Fire Sock Installation below DPC

QA18 - Working to Foundation Designs and level tolerances

QA19 - Understanding of DPM DPC Lapping

QA20 - Understanding of DPM Concrete corner installation to avoid cold bridging

QA21 - Drainage passing through substructure walls

QA22 - Movement Joints Below DPC

QA23 - Brown Downpipe Caps

QA24 - 300mm IC Chambers and their correct usage

QA25 - Low Level DPC below Concrete floor Beams

QA26 - Air Testing Drainage Under Oversites

QA27 - Threshold Drainage Channels

QA28 - Cold Bridging on cavity wall insulation DW Homes detail

QA29 - Cambridgeshire County Council Tarmac cutback on kerbs

QA30 - Insulation of Water Services and type to be used

QA31 - Ordering covers and Gullies to match existing when finishing sites

QA32 - Recording Private drainage Changes on Site when Changing Design

QA33 - Barratt David Wilson Screen Wall Detail

QA34 - Formation Preparation

QA35 - Plot Service Installation Separation

QA36 - NHBC RI Notification

QA37 - NHBC Drain Test Guidance

QA38 - MIDA Top 5 Defects 2024

QA39 - Private Drainage Outlet Caps

QA40 - Wall Tie Over 900mm

QA41 - First Off Manholes

QA42 - Ensure Waters are Capped at All Times

QA43 - Use of Ancon Steel Extenders

QA44 - Correct Choice and Installation of Aco Channels

QA45 - Installation of Insulation at Internal Wall junctions

QA46 - Correct Use and Need for Radii Kerbs

QA47 - Correct Use of Spacers on Ring Beams

QA48 - 100mm Bedding Below Pipes Under Buildings

QA49 - Fire Socks

QA50 - Ground Compaction

QA51 - Shingle Depth Under Internal Drainage

QA52 - Pile Cutting

QA53 - EPS Panel Cuts

QA54 - Rocker Pipes in Adoptable Drainage

QA55 - Tobermore Coping Fixing

QA56 - Underfloor Voids with Precast Floors Beams

QA57 - CBC Detail on 4 Course Channel